กก
What should I measure?
1. Schedule (planned vs. actual)
Commercial scheduling tools
2. Source instructions per component
SLOC per component.
3. Labor hours
how much have done, not how many are working on it
4. Classification of the component
New code
Changed code
Built for reuse
Reused code
5. Cost
$Cost/SLOC what's your bottom line?
6. Change requests (CRs)
Volatility of your component designs
7. Defects
Indicate the quality level of components
where in the life cycle you find the most defects and
how much it costs to fix them
กก
Technical measurements:
8. Time and quality for coding and design
9. Response time and/or throughput
CPU, memory and disk utilization
how fast does the system run?
กก
กก