The $/line is the cost per line, and the Line/month is the productivity for a particular function. From the expected LOC and the $/line we can estimate the cost. From the expected LOC and the Line/month we can estimate the person-months of the project.
The Deviation Ld enables us to give a range of estimates. for example,
Expected LC = 33360 Deviation = 1100 Therefore 68% range = 32260 to 34460 LOC 99% range = 26760 to 39960 LOC